Not Your Mother’s Trail Work Ride

9:00am Start Saturday May 10 @ King Eddy

The day before Mother’s Day, Michael is leading this trail work ride to clear the Lobster/Tunnel Trail that connects CJ Express to Oyama Lake FSR near Damer Lake. This trail is an important connector that enables a loop ride rather than having to ride King Eddy FSR back down again.

Safety meeting at 8:50am, ride rolls at 9:00am.

The plan is to perform 3 hours of trail work to clear the downed trees and alder encroaching on the trail to make a more enjoyable and safer experience for everyone.

Bring a lunch and your favourite trail clearing tool (chainsaw, hand saw, axe, brush saw, etc.) and the safety gear required for operating that tool.

A single tank of fuel will be enough for this ride. We’ll try to head for a ride after the trail work as a fun reward after a day revitalizing a great trail.

King Eddy FSR is approximately 9km east of Vernon on Highway 6, the staging area starts immediately off the highway with parking continuing alongside the road as needed.

Leave a comment